The design connects roof geometry to energy goals
A solar design is more than drawing rectangles on an aerial image. It should connect panel layout, string configuration, inverter selection, switchboard work, network settings and expected load profile into one buildable scope.
Roof model
Usable dimensions, pitch, orientation, shade, obstructions, setbacks and access zones.
Electrical design
Array configuration, inverter inputs, phase arrangement, protection, cable routes and switchboard scope.
Energy strategy
Daytime use, export, future electrification, battery readiness and any backup priorities.
Send a practical design brief for the Perth team to review
The Create a Design enquiry page collects the information that helps move a project from a broad idea to a useful technical conversation. A final design still needs verified dimensions, shade and structural considerations, electrical assessment, product specifications and current network requirements.
- Provide the postcode, property address and roof type.
- Explain existing solar, switchboard or battery equipment.
- Share approximate bill information and major daytime or evening loads.
- Identify future plans such as a battery, EV, pool, heat pump or home extension.

What should be clear before installation is scheduled
Equipment and layout
Panel and inverter model, quantity, roof faces, approximate array position, inverter location and monitoring pathway.
Electrical and building scope
Switchboard changes, protection, cable route, roof access, mounting type, trenching, meter or network steps and identified exclusions.
Battery and backup
Battery model, usable capacity, power output, location, backup circuits, phase behaviour and future expansion assumptions.
Customer decisions
Accepted optional items, finance pathway, rebate assignment, site access, communication equipment and any approvals required before work.
Turn your Perth solar design brief into a quote
Send your roof, electricity-use and future energy details, then request a written quote once the likely system pathway is clear.
